Bonython Hall - Adelaide University
Project Description
New air conditioning to existing Heritage listed Bonython Hall located on North Terrace, Adelaide, on the grounds of the Adelaide University .
Services Description
Chilled and heating water fan coils condition the hall. Chilled and Heating water is supplied from the Plaza Plant room. General exhaust systems remove air from the hall area. Computerised Building Management System (BMS) control the operation of the system.
Project Details: Completed Nov 05, Cost $600k
Mawson Centre - Uni of SA
Project Description
New building with two levels located in the Mawson Lakes Campus at Mawson Lakes . The facility incorporates a library, computer barn, staff offices, education/tutorial rooms and a lecture theatre.
Services Description
Chilled and Heating water pumps have been installed to supply conditioned water from the main central plant located in a separate building in the Campus. Air handling units are located in the roof plantroom and supplementary fan coil units installed in ceilings on Level 1 and 2. Most systems are fitted with full economy cycle operation. Ducted exhaust and outside air systems have been installed to ventilate the building. Reverse cycle split systems aircondition the Computer Barn and the Communications Room. A computerised Building Management System (BMS) has been installed and linked up with outside services to automatically control this building.
Project Details: Completed Feb 05, Cost $700k
Elder Hall - Adelaide Uni
Project Description
Heritage listed building in the Adelaide university used for Music teaching.
Services Description
Ceiling cassettes type units with fresh air systems. General wall exhaust systems also installed.
|
 |
Physics Building - Adelaide University
Project Description
Heritage listed building in the Adelaide university used for student teaching areas.
Services Description
Daikin VRV system with cassettes and wall hung style air conditioners with fresh air systems attached. Toilet exhaust and general exhaust systems.
Project Details: Completed June 2004, Cost $600k
Maths & Science Building - Flinders Uni
Project Description
New Maths and Science teaching facility building located at Bedford Park
Services Description Reverse cycle packaged and split style air conditioning systems incorporating economy cycles. Daikin VRV systems with cassette and ducted air handlers. Ducted exhaust and fresh air systems. Fume cupboards and Chemical storage cupboards were installed in some class rooms. Computerised Building Management System (BMS) control the operation of the systems.
Project Details: Completed 2003, Cost $1m Elizabeth TAFE Project Description
This is a purpose built facility for TAFE's training activities consisting of various office and administration buildings, training work shops and classrooms.
Services Description
Westside has undertaken a number of projects on this site as head contractor working closely with the facility manager so as to cause minimum disruption to the students. Mechanical Services works carried included welding booth exhaust systems, Various office air conditioning systems, Child care centre a/c systems, and Air to air heat exchange odour control system.
Marleston TAFE
Project Description
This building was originally a saw tooth style factory building converted to suit the needs of TAFE's woodworking and haberdashery training facilities. It houses administrative offices and practical training facilities.
Services Description
The Mechanical Services works included the removal of redundant roof mounted evaporative cooling systems and replacement with new evaporative coolers and ducted, gas fired heaters.
Roseworthy College
Project Description
New multi-purpose building housing offices and testing facilities for agricultural training purposes.
Services Description
Mechanical Services consisted and a number of specialist systems including fume cupboards, dust extraction and split ducted and ceiling cassette style a/c systems.
St Peters College Swimming Centre
Project Description
New state of the art swimming centre, gymnasium and multi-purpose basketball court hall. The centres swimming pool has dive board facilities, lap racing and includes spectator seating and viewing areas for carnival meetings.
Services Description
Westside's Mechanical Services installation consisted of the supply and installation of chilled water system including chiller, pumps, coils and air handling. The installation is a first for South Australia and is essentially a state of the art poll water heating system using a chiller and heat exchanger. Westside worked with the pool contractor providing an integrated system all controlled by a computerised Building Management System (BMS).
Flinders University - Sturt Theatre
Project Description
This project consisted of a major refurbishment to the four story university lecture theatre building. The main facility housed in this building is a large, tiered seating, lecture theatre complimented by various smaller lecture rooms and administration facilities.
Services Description
The Mechanical Services consisted of the modifications, upgrade and additions to an existing chilled water system and included the supply and installation of associated chiller, cooling tower, pumps, supplementary heating coils, ducted and ceiling cassette a/c systems. The works included the supply and installation of a computerized Building Management System (BMS) to control both the exiting and new equipment.
Wilderness School
Project Description
Existing three story school class room building including basement work shop and car parking facilities.
Services Description
The existing building was serviced by a ducted fresh air facility providing unconditioned outside to the occupied areas. Our works consisted of the conversion of the existing ventilation system into a reverse cycle air conditioning system. The existing outside air intake plant room was converted to house a built-up evaporator coil complete with TX valves piped to an externally mounted condensing unit.
Yatala Labour Prison 'E' Division
Project Description
As the head contractor Westside was responsible for the removal of the existing redundant Mechanical Services including extensive building works. The building is a 3 story correctional facility with cells housing medium risk prisoners, day activities areas, officers stations and infirmary.
Services Description
Roof mounted plant including evaporative cooling and indirect fired gas heating systems. Various ducted exhaust systems. Computerised Building Management System (BMS). New fire smoke detection system including dual Fire Indicator Panels (FIP). |